Beijing Hongtech Co., Ltd.
Main products:Welding Machine,AC Recycling Machine
Products
Contact Us
  • Contact Person : Ms. Tang kylie
  • Company Name : Beijing Hongtech Co., Ltd.
  • Tel : 86-10-51985599
  • Fax : 86-10-51985866
  • Address : Beijing,Beijing,1A No.9 Building,5Area,Shiji Cheng,Haidian District,
  • Country/Region : China
  • Zip : 100097

SBB120 Prep-Station spray booth/preparation station

SBB120 Prep-Station spray booth/preparation station
Product Detailed
SBB120(without basement) Preparation Station CE certification guarantees excellently performance,strong practicabilities

SBB120(without basement) Preparation Station is an typicalpreparation station which absorbing several technical advantages fromabroad.The main features of removing dust and waste gas willimproves service degree and ensuring health of operators which willtakes more better working environment for different paint workshops.The inner dimension 6300×3450×28000mm is very popular in many countries.CE certification guarantees excellently performance,strong practicabilities,and high economical efficiency.We also can adjust the size according to customer's desires.

Technical Data

Inside dimension6300×3450×2800mm
Outside dimension7550×3550×3200mm
Basement & FloorWithout basement,2 rows pit paved by grille, each pit dimension:4610×710mm(L*W).
Ceiling SystemDimension:6400X3550X520mm(LxWxH), 4 sides covered by plate, with lights on 2 length sides of roof
Generator Setting2 rows of pit for exhaust air,quadrate steel frame, blue coated steel.
Intake & Exhaust air systemGenerator dimension: 1300×1100×1100mm(L×W×H);with 1 set 5.5KW  fanfor exhaust air,belt-drive motor position: outside;Air capacity is16000M3/H, with electric  damper to control the exhaust air capacity.
Sealed TypeBack side set 50mm EPS,other 3 sides with PVC soft curtain,curtaincolor: upper part: white, middle part:transparent,lower part: blue
Ceiling InstallationSteel rope hangting or steel pole supporting the roof(Option).
Filtering SystemPre-filter pocket,floor filter(fibreglass).
Lighting System8units x4=32pcs36W
Control SystemControl the operation of fan, lighting and electric damper
Voltage frequencyAs request
Total Power7KW

SBB120 Prep-Station spray booth/preparation station



Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.